工程项目
WhatsApp Image 2024-04-20 at 11.04.24
项目摘要

工程总额:

  • $ 60.9M

 

合约工期:

  • October 2023 to November 2024

工程项目:

  • Hoarding Works
  • Pipe Pile Works
  • Bored Pile Works
  • Excavation and Installation of Lateral Supports
  • Pile Cap Works
快照
WhatsApp Image 2024-04-20 at 11.07.34
WhatsApp Image 2024-04-20 at 11.04.25
WhatsApp Image 2024-04-19 at 18.09.45