PROJECT SUMMARY
Scope of Works:
|
Contract Sum:
|
Contract Period:
|
The works comprise of over 8000m of driven steel bearing piles, where heavy machine of hydraulic hammer and drop hammer piling rigs are employed for installation of the piles. The pile cap system involved approximate 1600m3 concrete, 100 ton steel sheet pile as the temporary earth supporting system and 17000m3 excavation works. The project was implemented with environmental requirement of HK BEAM Plus.