Job References
TPTL 223 & 229, LO FAI ROAD, TAI PO
PROJECT SUMMARY
|
Scope of Works:
|
|
Contract Sum:
|
|
Contract Period:
|
Around 180,000m³ of soil & rock are excavated with 2,000m³ of material disposed daily. The project was implemented with environmental requirement of HK Beam plus.
SNAPSHOT
Carrying Out Pipe Piling Works
Rock Breaking with Hydraulic Breaker
General View