PROJECT SUMMARY

Scope of Works:

  • 6 nos. of bored piles with 3.0m diameter average 40m depth
  • ELS works including pipe pile wall installation and grout curtain, excavation and shoring installation.
  • Pile cap and basement wall construction works

Contract Sum:

  • $59.5M

Contract Period:

  • September 2018 – December 2019

Steel platform is designed to facilitate both the foundation and building works. The project was implemented with environmental requirement of HK BEAM Plus.