工程项目
ebfd1bf5-311b-4584-abd9-31bd84b4b81a
九龙窝打老道93-95A号
项目摘要

工程范围:

  • 6 nos. of bored piles with 3.0m diameter average 40m depth
  • ELS works including pipe pile wall installation and grout curtain, excavation and shoring installation.
  • Pile cap and basement wall construction works

工程总额:

  • $59.5M

合约工期:

  • September 2018 – December 2019

钢结构平台设计同时巩固地基基础和建筑工程。 该项目符合HK BEAM Plus的环保要求。