Job References
8eeb8afe44414923fc7fec6633aff06
PROJECT SUMMARY

 

 
Contract Sum:

  • $23M

Contract Period:

  • April 2021 to February 2022

Scope of Works:

  • 4 nos. of bored piles with 2.5m diameter average 25m depth
  • ELS works including pipe pile wall installation and grout curtain, excavation and shoring installation.
  • Pile cap works
SNAPSHOT
2
3
5
6
1
4